Operating Manual |
|
|
Our Operating Manual is available in Microsoft Publisher format.
|
Customer Record Where Purchased __________________ Date Purchased ___________________ Model # MB-B36 One Year Warranty From date of purchase, GDI, Inc. warrants any part, or parts of unit for one year. Upon examination by factory authorized personnel, parts found to be defective in material or workmanship will be repaired or replaced at no cost. GDI, Inc. shall not be liable for any incidental or consequential damages. This warranty is declared void if the equipment is found to have been misused, abused or tampered with by unauthorized personnel.
|
|
Customer Service Phone: 870-642-7270 8:00 am until 5:00 pm (Central Time) Monday thru Friday Web: www.megabreeze.com Email: btatum12@windstream.net
|
|
Operating Procedure 1. Connect water hose to water supply. 2. Connect water hose to 3/4 inch adaptor on unit and allow reservoir to fill to capacity. Water flow will automatically shut off at proper level. 3. Align splash guard (curved semicircular pipe located above spray bar). 4. The spray bar should distribute water flow in an upward vertical direction. To adjust the spray bar, gently turn until the bar is angled upward 2-6 degrees facing intake side of cooling pads. In the correct position, the splash guard and spray bar are designed to provide maximum water coverage over the cooling pad surface. 5. Turn on pump switch and allow to run for 2-3 minutes. 6. Turn on fan switch to begin air circulation. 7. When not in use, turn off pump and fan switches. Drain water from reservoir.
|
|
|
|
Warning: Use of heavy duty electrical cord (no lighter than 12/3) is advised. Keep cord length to a minimum.
|
MAINTENANCE Cooling pads for this evaporative unit are cross-fluted with an intake and discharge side. They are directional, and are clearly marked with arrows to show proper vertical and horizontal installation. When removing pads for maintenance, such as cleaning the interior of unit, always: 1. Disconnect all sources of electricity from unit. 2. Remove screws from metal guard located above pads. 3. Remove center pad first and then remaining pads. 4. When reinstalling pads, insert right and left pads in unit. Center pad is inserted last. With proper care, cooling pads will last 3 to 5 years. If unit is used on a daily basis, pads should be dried each day. Drain sump and replenish with fresh water before reusing. To Remove Water from Sump Area (Flushing) 1. Turn unit off. 2. Remove cap located below water intake hose. 3. Turn on pump. Pump will remove water from sump. If purging water into a drain: 1. Connect hose to fitting where cap was removed. 2. Remove center pad to access shutoff valve on spray bar. 3. Turn valve to “OFF” position. 4. Turn on pump and pressure will be diverted to drain hose. 5. When water is completely removed, turn off pump and turn shut-off valve to “ON” position.
|
|
Pads should be fully dried every 24 hours during periods of continuous use. This will discourage growth of algae. Watch for dry streaks on intake side of pads. If they are observed, disconnect from electrical source, remove pads and spray bar and disassemble. Clean spray bar and properly reinstall. Reassemble unit and check for proper water distribution. Proper water distribution is the single most important means of prolonging pad life. The water will flush away dirt and contaminants which may be harmful to the pad. Areas “starved” for water will be the first to clog or soften. Do not turn off water during operation. Water flow must be maintained at a constant rate. Evaporative cooling pads are designed to use a recommended quantity of water flow for maximum performance. Your MEGA-Breeze cooling unit is built in accordance in these standards. This water flow will provide a protective surface on the pad. Only a small portion of the water will evaporate, the rest will serve to flush and clean pads during operation. REMEMBER: Completely dry pads daily to curb algae growth. Clean and flush sump on a regular basis - at least 1-2 times per week of heavy use. DO NOT USE DETERGENT IN UNIT! |
|
Pad Installation In order to get the best performance from your cooling pads, they must be installed properly. Pads must always be installed with the steeper flute angle sloping down toward the air entry side. The steeper angle puts more water on the hot, dry side of the pad where it is needed most. This counteracts the tendency for air to push the water toward the back of the pad.
|
|
Warranty Card Complete and return within 15 days of purchase to: Towering Industries 419 N. 6th Street De Queen, AR 71832 Company Name ___________________________ Contact Person ____________________________ Address __________________________________ _________________________________________ City _____________________________________ State _____________ Zip _________________ Phone ___________________________________ Email ___________________________________
Date of Purchase __________________________ Place of Purchase _________________________ Model # MB-B36
|
|